| Bank of Ghana. |
| Supply and Installation of Air cooled and Water cooled chillers for Cedi House and Head Office |
| |
| Micheletti New Head office- Pantang |
| Supply and Installation of air conditioning systems |
| |
| Westel Ghana Ltd. |
| Supply and Installation of split and ceiling concealed ducted air conditioning & Ventilation systems for the Data Centre at Ridge |
| |
| Westel Ghana Ltd. |
| Supply and Installation of split and ceiling concealed ducted air conditioning & Ventilation systems for the Data Centre at Spintex. |
| |
| Red Sea Housing (Free Zones) |
| Supply of Window & Split air conditioning Units. |
| |
| Ghana Airports Company Ltd |
| Supply and Installation of Split Freestanding air conditioning Unit |
| |
| Cargill Cocoa Processing Plant |
| Design, Supply and Installation of air conditioning and ventilation systems |
| |
| Primrose Properties |
| Supply and Installation of air conditioning equipment. |
| |
| Ghana Broadcasting Corporation |
| Supply and Installation of central air conditioning system |
| |
| Ohene Djan Sports Stadium |
| Design, Supply and Installation of air conditioning and ventilation system |
| |
| SSNIT – Ridge Towers |
| Relocation of air conditioning indoor units + remedial works |
| |
| British American Tobacco - Warehouse |
| Supply and installation ofVentilation system |
| |
| Consulate |
| Design, Supply and Installation of air conditioning and ventilation system for six town houses |
| |
| Ghana Health Services Training School Hostel – Pantang-Accra |
| Design, Supply and Installation of air conditioning system |
| |
| Letap Pharmaceuticals |
| Design, Supply and Installation of ductwork for an air distribution system |
| |
| Atlantic International |
| Supply and installation of air conditioning & Ventilation for New offices for Atlantic & branch office Amalbank. |
| |
| GCAA/PW |
| Supply & Installation of Extract ventilation system for wash rooms at Kotoka International Airport |
| |
| Virgin Nigeria Airlines |
| Supply & Installation of Air conditioning and ventilation system for Airline office |
| |
| SSNIT – Premier Towers |
| Rehabilitation of air conditioning system at Premier Towers, Accra |
| |
| SSNIT-Ridge Towers |
| Remedial works on Central Air-Conditioning System at Ridge Towers, Accra |
| |
| GhanaTelecom, Kumasi Exchange |
| Supply and installation of Packaged Central units (3 x 30 TR) |
| |
| Ghana Telecom – Accra- North |
| Supply & Installation of two 53TR Condensing Units with one Air handling Unit + Duct-work & Accessories. |
| |
| KCCR-Kumasi |
| Supply & Installation of split unit air conditioners and ventilation equipment |
| |
| Tema Container Terminal |
| Supply and installation of split unit air conditioners |
| |
| National Archives |
| Supply and installation of high capacity split units for humidity control of the repositories |
| |
| Valco Aluminium Company Limited. |
| Pilot project to monitor the heat generation, air temperature distribution and flow patterns in a rectifier cabinet. Equipment installed included high static ducted fan coils, air cooled condensers and data loggers. |
| |
| Ghana Telecom – Cantonments Exchange |
| Supply & Installation of two 50TR Condensing Units with one Air handling Unit + Duct-work & Accessories. |
| |
| Phyto Riker Pharmaceuticals |
| Supply & Installation of two 30TR Dx Unit with Duct-work & Accessories. Office Complex |
| |
| Amalgamated Bank Limited |
| Supply & Installation of 6TR Chillers & Fan Coils with Piping & Accessories. Offices/Banking Hall |
| |
| Ghana Telecom |
| Supply & Installation of two 50 TR Condensing Units. Accra Central Exchange |
| |
| Phyto Riker Pharmaceuticals |
| Supply & Installation of 30TR Dx Unit with Ductwork, HEPA Filters & Accessories. Clean Room |
| |
| Phyto Riker Pharmaceuticals |
| Supply & Installation of one 30TR & one 20TR Dx Units with Ductwork & Accessories. Warehouse, Achimota |
| |
| National Archives, Accra |
| Renovation of existing Central Unit and Refit of air cooled Condensing Units in place of cooling towers |
| |
| P & T, Accra, Winneba, Akim Oda, Cape Coast |
| Supply of split unit air conditioners |
| |
| P & T, World Bank Project |
| Supply & Installation of a total of 500 TR Dx type equipment consisting of modules of 20, 30, 40, and 50 TR Exchanges at Accra North, Accra central and Cantonments |